Breaking News

maritim

Stealth ship cutaway

peace     05.43    

The Littoral Combat Ship’s (LCS) minimally manned core crew goal is 15 to 50 manpower requirements and the threshold, for both core and mission-package crews, is 75 to 110. This dramatically smaller crew size will require more than current technologies and past lessons learned from reduced manning initiatives. Its feasibility depends upon changes in policy and operations, leveraging of future technologies and increased Workload Transfer from sea to shore along with an increased acceptance of risk.

More

0 komentar :

Military

African News

Proud

World Affairs

Others

Technology

© 2011-2014 ACDI. Designed by Bloggertheme9. Powered by Blogger.